Bathroom Renovation by Mark and Karen- My Windsor Project Contest Entry

A bathroom reno by Mark and Karen

The materials we used for the reno are as follows:
• 4 1/2″ MDF flat stock
• #497 at the bottom of the wall.
• Bead board paneling. Sold in 30 or 32″ X 48″ sections.
• Another strip of the 4 1/2″ flat stock.
• A strip of MDF Base cape #3714 set 1/2″ down from the top.
• Pine corner cove #3266 in all inside corners.
• Pine corner moulding #202 on the out side corners.
• The frame for the mirror is MDF casing #381.
• The upper moulding I believe is Crown #051

Bathroom before
bath5 bath4

Bathroom after

Bath1 bath2 bath3

Comments are closed.

Scroll to top